479.709.0044

Projects

Commercial

Alma

City of Alma Fire Station #1

Location: Alma, Arkansas

Year of Completion: 2009

Description: City of Alma – Office Additions at Fire Station #1

  • Location: Alma, Arkansas
  • Description: In 2009, Turn Key Construction Management completed renovations to the existing facility as well as an office addition.
  • Architect: Architecture Plus, Inc.
  • Size: 1,677 Square Feet

 

View Project Gallery

Fort Smith

University of Arkansas Fort Smith

Location: Fort Smith, Arkansas

Year of Completion: 2013

Description: Nursing student training facility. This lab simulates a hospital patient floor. The patient bed locations are equiped with Hillrow power columns which allow the students to learn how to treat patients in a realistic environment. The “patients” are high-tech dummies which mimic various medical conditions and are controlled and monitored by instructors concealed in another room with one-way glass.

Testimonial:

It has been my pleasure working with the people of Turnkey Construction Management. The project undertaken was very technical in nature and required utilization of many disciplines. Their willingness and flexibility made the project come in on budget and ahead of schedule.

Turnkey’s subcontractor oversight and management of expectations was excellent. Very few issues lagged and they communicated any issue early which prevented them from becoming delayed.

I would not hesitate welcoming them back to our campus for any future projects.

Sincerely,

Larry Chilton

Project Manager
University of Arkansas Fort Smith

View Project Gallery

Arkansas Oklahoma Gas

Location: Fort Smith, Arkansas

Year of Completion: 2013

Description: Remodel of existing corporate office facility including customer service, administrative office, conference room, kitchen area, upgrading of mechanical and data systems. All work was accomplished while bring a fully client occupied facility.

Size: 9,670 Square Feet

Architect: Architecture Plus

Testimonial:

“Turn Key was the general contractor on an extensive renovating project for AOG. We were pleased with the scheduling of the work and the end product, and would not hesitate to utilize Turn Key’s services in the future.”

Michael J. Callan, President

 

View Project Gallery

Next Step Dayroom

Location: Fort Smith, Arkansas

Year of Completion: 2012

Description: Description: A 2-story transitional home for veterans consisting of 16 private bedrooms, 3 community bathrooms and commercial kitchen with large central commons area. Constructed in residential fashion with wood framed structure on concrete slab. Maintenance free exterior finishes consisting of vinyl siding and windows, brick wainscot and architectural singles.

View Project Gallery

Fort Smith Transit Station

Location: Fort Smith, Arkansas

Year of Completion: 2010

Description:

  • Location: Fort Smith, Arkansas
  • Description: Completed in 2010, the award-winning Transit Station is a one-story masonry structure with wood trusses and metal roofing. The park-like theme includes inside and outside seating.
  • Architect: Guest Reddick Architects
  • Size: 1,213 Square Feet
  • Owner: City of Fort Smith, Ken Savage, Director of Transit Authorities: 479.783.6464

AWARD: ABC EXCELLENCE IN CONSTRUCTION, 2012

 

 

Testimonial:

“Sandy employs a professional team that take pride in their work and value each project as if it were their own. She personally reviews all subcontractors’ references prior to selection and maintains a level of competency and expectancy throughout the project. Turn Key works in harmony with the project architect and owner alike.”

Ken Savage, Transit Director

 

View Project Gallery

Bost / Frick Building

Location: Fort Smith, Arkansas

Year of Completion: 2008

Description:

  • Location: Fort Smith, Arkansas
  • Description: Addition to existing office administration building, which doubled the square footage. Construction also added a covered exterior patio area and additional parking at south, east and west parking lots.
  • Architect: Architecture Plus, Inc.
  • Size: 4,500 Square Feet
  • Owner Contact: Kent Jones, Executive Director: 479.478.5551

 

 

Testimonial:

“As an architect, I value Turn Key’s input during the design process as they provide accurate construction budgets and methods of construction which ultimately result in better facilities. They are willing to devote whatever time or resources are necessary to ensure the project progresses as it should, while still making certain that no corners are cut, nor small important details left out.”

Michael G. Johnson, AIA, LEED AP

 

View Project Gallery

4200 Jenny Lind

Location: Fort Smith, Arkansas

Year of Completion: 2009

Description: 4200 JENNY LIND

  • Location: Fort Smith, Arkansas
  • Description: Construction consisted of remodeling 14,000 Square Feet of an existing clinic and created 5 separate lease spaces for medical and accounting professionals. Construction also included a new covered canopy entrance at the north side of the building.
  • Cost: $1.1 Million
  • Architect: Guest Reddick Architects Square Footage: 14,072
  • Owner Contact: Certified Public Accountant: 479.649.0888

Testimonial:

“Our project with Turn Key resulted in a seamless effort to schedule logical sequencing for the project thus causing the least amount of disturbance to the existing tenant. Not an easy task considering the need to interrupt utilities from time to time, but Turn Key scheduled these items to be done during none business hours without additional expense to the owner.”

David. W. Conyers, Vice President, Guest, Reddick Architects

 

View Project Gallery

Greenwood

nothing found.

Springdale

Springdale Police CID

Location: Springdale, Arkansas

Year of Completion: 2013

Description:  

  • Size: 9,800 Square Feet
  • Description: Constructed on the Razorback Trailway, is the rehabilitated existing two story structure with a basement creating a police Criminal Investigation Division office facility with a reception area, conference, interrogation, observation rooms and multiple offices. The project also incorporates a complete workout facility with shower and dressing areas for the Springdale police personnel.
  • Owner Contact: Wyman Morgan, City of Springdale: 479.750.8114

View Project Gallery

Van Buren

Experian

Location: Van Buren, Arkansas

Year of Completion: 2013

Description: Remodel of existing employee break room vending are including new finishes and millwork

View Project Gallery

Education

Booneville

Booneville VO-AG Building

Location: Booneville, Arkansas

Year of Completion: 2009

Description:

  • Location: Booneville, Arkansas
  • Cost: $332,995
  • Year of Completion: 2009
  • Description: New construction/ renovation to existing facilities. Exterior structure pre-engineered metal building and roof.
  • Owner Contact: John Parrish, Superintendent, Booneville Public Schools: 479.675.3504

Testimonial:

“Turn Key exceeded our expectations! They met all scheduled deadlines in spite of the project being started during inclement weather. My board informed me that Turn Key was the first construction company that they did not have to be involved with to resolve construction issues. They are a dependable company that you can trust.”

John K. Parish, Superintendent Booneville Public Schools

 

View Project Gallery

Cedarville

Cedarville Public Schools – Baseball Field

Location: Cedarville, Arkansas

Year of Completion: 2011

Description:

  • Location: Cedarville, Arkansas
  • Cost: $42,100- Construction Management
  • Description: Baseball Field. The new high school baseball field replaced an aging complex giving the school a field better situated for both pedestrian and vehicular circulation, along with improved bleach¬ers and concession stand.
  • Owner Contact: Dan Foreman, Superintendent, Cedarville Public Schools: 479.474.7220

 

 

 

 

Testimonial:

“The projects have ranged from drainage improvements, to classroom additions, to a high school baseball field and a safe room.  They have helped in keeping each project within our budgeted monies and have completed them on schedule.  They are excellent at coordinating the construction with our school calendar and their on-site job superintendents are very knowledgeable, courteous, and go out of their way to keep everyone informed, while keeping the schools fully operational.”

Dr. Dan Foreman, Superintendent

View Project Gallery

Cedarville Elementary School

Location: Cedarville, Arkansas

Year of Completion: 2011

Description:

  • Location: Cedarville, Arkansas
  • Size: 54,876 Square Feet
  • Cost: $1,394,598 – Construction Management
  • Description: Elementary School Upgrades. This project involved many improvements throughout the school including HVAC renovations, new acoustical ceiling tile, lighting/electrical upgrades, and new roofing.
  • Owner Contact: Dan Foreman, Superintendent, Cedarville Public Schools: 479.474.7220

View Project Gallery

Cedarville Elementary School – Tornado Shelter

Location: Cedarville, Arkansas

Year of Completion: 2012

Description:

  • Location: Cedarville, Arkansas
  • Size: 6,250 Square Feet
  • Cost: $1.3 Million- Construction Management
  • Description: Tornado Shelter Facility. This safe room doubles as the elementary school cafetorium. The building structure is pre-cast concrete walls and ceiling, with brick veneer on the outside to enhance the aesthetic value. The interiors are designed with a commercial kitchen and restrooms to complete the multi-purpose/cafetorium facility.
  • Owner Contact: Dan Foreman, Superintendent, Cedarville Public Schools: 479.474.7220

 

 

 

 

View Project Gallery

Cedarville High School

Location: Cedarville, Arkansas

Year of Completion: 2011

Description:

  • Location: Cedarville, Arkansas
  • Size: 5,780 Square Feet
  • Cost: $2,947,000 (Middle and High School Total)- Construction Management
  • Description: Classroom Addition, New Gymnasium, Cafeteria Expansion. The High School addition includes new classrooms and science labs as well as a cafeteria expansion. Custom millwork was installed in each science lab and the cafeteria is home to a feature ‘window-wall’ that opens to the adjacent outdoor patio. The exterior structure is CMU with brick veneer.
  • Owner Contact: Dan Foreman, Superintendent, Cedarville Public Schools: 479.474.7220

 

 

View Project Gallery

Cedarville Middle School

Location: Cedarville, Arkansas

Year of Completion: 2011

Description:

  • Location: Cedarville, Arkansas
  • Size: 16,940 Square Feet
  • Cost: $2,947,000 (Middle and High School Total)- Construction Management
  • Description: Classroom Addition and New Gymnasium. This project involved a classroom addition including a new gymnasium. The exterior structure is a pre-engineered metal building with brick veneer. Interior finishes consist of custom patterns within the VCT flooring as well as wood athletic flooring in the gymnasium.
  • Owner Contact: Dan Foreman, Superintendent, Cedarville Public Schools: 479.474.7220

 

 

View Project Gallery

Cedarville Public Schools

Location: Cedarville, Arkansas

Year of Completion: 2011

Description:

  • Location: Cedarville, Arkansas
  • Year of Completion: 2011
  • Description: Drainage Improvements. Our team worked with Cedarville Public Schools improving drainage on their school campus. This site work has helped the schools system, not only improve but also maintain proper function for the future.
  • Owner Contact: Dan Foreman, Superintendent, Cedarville Public Schools: 479.474.7220

 

 

Testimonial:

“Turn Key Construction handled all aspects for all of our projects, exceptionally well. They have helped in keeping each project within our budgeted monies and have completed them on schedule. They are excellent at coordinating the construction with our school calendar and their on-site job superintendents are very knowledgeable, courteous, and go out of their way to keep everyone informed, while keeping the schools fully operational.”

Dr. Dan Foreman, Superintendent

View Project Gallery

Fort Smith

Northside High School Auditorium

Location: Fort Smith, Arkansas

Year of Completion: 2013

Description: High tech lighting, audio and video upgrades with new control booth, rigging, lifts, stage curtains, dressing rooms and mezzanine areas.

View Project Gallery

Hobson Preschool

Location: Fort Smith, Arkansas

Year of Completion: 2013

Description:

  • Location: Fort Smith, Arkansas
  • Size: 6,347 Square Feet
  • Cost: $300,200
  • Year of Completion: 2013
  • Description: The preschool was originally built in 1963 and has been modernized and renovated, including the playground with rubber cushion tiles.
  • Owner Contact: Krista Hinson, Director 479.783.4552

View Project Gallery

Parker Center

Location: Fort Smith, Arkansas

Year of Completion: 2004

Description:

  • Location: Fort Smith, Arkansas
  • Cost: $150,000
  • Year of Completion: 2004
  • Description: Restroom Remodel
  • Owner Contact: Fort Smith Public Schools

 

 

 

 

View Project Gallery

Kimmons Junior High School

Location: Fort Smith, Arkansas

Year of Completion: 2009

Description: Restroom Upgrades

 

 

View Project Gallery

Sunnymede Elementary School

Location: Fort Smith, Arkansas

Year of Completion: 2009

Description:

  • Location: Fort Smith, Arkansas
  • Cost: $613,019
  • Description: Lights, Ceiling & Restroom Remodel
  • Owner Contact: Fort Smith Public Schools

 

 

 

 

View Project Gallery

Southside High School – Restroom Renovations

Location: Fort Smith, Arkansas

Year of Completion: 2008 / 2009

Description:

  • Location: Fort Smith, Arkansas
  • Cost: $163,908
  • Year of Completion: 2008/2009
  • Description: Restroom Renovations
  • Owner Contact: Fort Smith Public Schools

 

 

 

 

View Project Gallery

Southside High School

Location: Fort Smith, Arkansas

Year of Completion: 2010

Description:

  • Location: Fort Smith, Arkansas
  • Cost: $176,552
  • Year of Completion: 2010
  • Description: Renovations & Improvements to Existing Facility
  • Owner Contact: Fort Smith Public Schools

 

 

 

 

View Project Gallery

Northside High School

Location: Fort Smith, Arkansas

Year of Completion: 2011/2012

Description:

  • Location: Fort Smith, Arkansas
  • Cost: $137,583
  • Description: Window Replacement/Renovation
  • Owner Contact: Fort Smith Public Schools

 

 

 

 

View Project Gallery

Kimmons Junior High School

Location: Fort Smith, Arkansas

Year of Completion: 2009/2010

Description:

  • Location: Fort Smith, Arkansas
  • Cost: $153,400
  • Description: Renovations to Existing Facilities
  • Owner Contact: Fort Smith Public Schools

 

 

 

 

View Project Gallery

Ramsey Junior High School – Tornado Shelter

Location: Fort Smith, Arkansas

Year of Completion: 2011

Description:

  • Location: Fort Smith, Arkansas
  • Size: 7,100 Square Feet
  • Cost: $1,116,111- competitive bid
  • Year of Completion: 2011
  • Description: Tornado Shelter Facility. This building structure is complete with pre-cast concrete walls and ceiling, with brick veneer on the outside to enhance the aesthetic value. The interior is designed with offices, restrooms, and a special rubber flooring to complete the multi-purpose/multi-educational facility.
  • Owner Contact: R. Lynn Ellison, Retired Director of Buildings and Grounds, Fort Smith Public Schools: 479.806.3542

 

 

 

 

Testimonial:

“Turn Key was very professional and made it a point to keep the administration informed during the entire project. When use of parking lots or entries to the school would be affected deliveries, they would inform us in advance so that we could inform parents and staff.”

Dennis Siebenmoren, Principal, Ramsey Junior High

 

View Project Gallery

Chaffin Junior High School

Location: Fort Smith, Arkansas

Year of Completion: 2009

Description:

  • Location: Fort Smith, Arkansas
  • Size: 180,000 Square Feet
  • Cost: $2,095,000- competitive bid
  • Description: Building Upgrades. This project involved completely new HVAC systems, lighting, acoustical ceilings, flooring and painting throughout the school. The work also included full renovations to four large restrooms and the installation of a two-stop elevator. The work occurred in four phases with the vast majority of the work requiring completion in 75 days.
  • Owner Contact: R. Lynn Ellison, Retired Director of Buildings and Grounds, Fort Smith Public Schools: 479.806.3542

 

 

Testimonial:

“The largest and most complex project was the renovation of Chaffin Jr. High School. This project had a short time line, and even with unforeseen complications such as a massive asbestos abatement, it was completed ahead of schedule with a minimum of disruption to the school routine.”

R. Lynn Ellison

Director of Buildings and Grounds, Fort Smith Public Schools

 

“Turn Key constantly communicated with us during the project and included us in progress meetings.  Their staff was available at all times as concerns came up and t hey were willing to do all they could to resolve them.  They took personal pride and ownership in their work.”

Todd Marshell, Chaffin Junior High, Principal

View Project Gallery

Sutton Elementary School

Location: Fort Smith, Arkansas

Year of Completion: 2012

Description:

  • Location: Fort Smith, Arkansas
  • Size: 16,800 Square Feet
  • Cost: $2,430,000- competitive bid
  • Description: This project involved an eight-classroom, a cafeteria addition, with alterations to existing classroom areas. The structure is reinforced masonry with brick veneer. Interior finishes consist of custom patterns of carpets and rubber flooring.
  • Owner Contact: Alan Love, Director of Buildings and Grounds, Fort Smith Public Schools: 479.785.2501

 

 

 

 

View Project Gallery

Student Support Facilities

Location: Fort Smith, Arkansas

Year of Completion: 2007

Description: ADDITION / REMODEL

  • Location: Fort Smith, Arkansas
  • Description: An existing outdated office space required complete interior demolition and created a new student services office with a mezzanine file storage area. Construction added a new covered front entry and back entry, and repainted the entire existing metal building that housed the food storage warehouse and office.
  • Architect: Architecture Plus, Inc.
  • Size: 3,200 Square Feet
  • Owner Contact: R. Lynn Ellison, Retired Director of Buildings and Grounds: 479.806.3542

 

 

View Project Gallery

Mena

Mena Public Schools

Location: Mena, Arkansas

Year of Completion: 2012

Description:

  • Location: Mena, Arkansas
  • Size: 3,456 Square Feet
  • Cost: $2.1 Million for all three- competitive bid
  • Year of Completion: 2012
  • Description: Three Tornado Shelter Facilities. Each building structure consists of pre-cast concrete walls and ceiling, with brick veneer on the outside to enhance the aesthetic value. The interiors are designed with offices, restrooms, and athletic wood flooring to complete the multi-purpose/multi-educational facility.
  • Owner Contact: Diann Gathright, Former Superintendent 479.394.1710

 

 

 

 

View Project Gallery

Poteau

Pansey Kidd Middle School

Location: Poteau, Oklahoma

Year of Completion: 2011

Description:

  • Location: Poteau, Oklahoma
  • Size: 5,829 Square Feet
  • Cost: $630,000- competitive bid
  • Description: Library Addition/ Administration area renovations for the Poteau Public School system. With the enrollment constantly growing the school was in need of remodeling the entire administration area complete with new offices and more energy efficient lighting and HVAC system. Along with the ad¬ministration remodel, we added on to the existing library to accommodate more educational resources including literature and computers.
  • Owner Contact: Alice Smith, Former Superintendent, Poteau Public Schools: 918.647.9869

View Project Gallery

Poteau High School

Location: Poteau, Oklahoma

Year of Completion: 2012

Description:

  • Location: Poteau, Oklahoma
  • Size: 8,300 Square Feet
  • Cost: $968,010 – competitive bid
  • Description: New building and courtyard renovations. This facility for the Poteau Public School system added some greatly needed space for expansion. This addition includes classrooms, restrooms, and a modernized administration area so that the faculty and staff can have the extra space needed to better serve the students.
  • Owner Contact: Alice Smith, Former Superintendent, Poteau Public Schools: 918.647.9869

 

 

 

 

Testimonial:

“Many times I would stop by on weekends or later in the evenings, surprised to find Turn Key’s jobsite superintendents working well beyond the normal expected hours, all in an effort to keep the projects on schedule.  Sandy Dixon herself attended the majority of the weekly jobsite meetings.”

Michael Riley, AIA

Architect

View Project Gallery

Van Buren

Adult Education Center

Location: Van Buren, Arkansas

Year of Completion: 2009

Description:

  • Location: Van Buren, Arkansas
  • Cost: $197,600
  • Description: Renovations to Existing Facilities
  • Owner Contact: Van Buren Public Schools

 

 

 

 

View Project Gallery

Waldron

Alternative Learning Center

Location: Waldron, Arkansas

Year of Completion: 2009

Description:

  • Location: Waldron, Arkansas
  • Description: Renovations and additions to the existing Alternate Learning Center created additional classrooms, dining area and kitchen. A majority of the existing concrete floors were polished and stained to create maintenance free floors.
  • Architect: Douglas Arnold & Associates
  • Size: 11,433 Square Feet
  • Owner Contact: Dr. James Floyd, Superintendent: 501.626.9187

Testimonial:

“I found Ms. Dixon to be very professional and easy to work with in her dealings with all parties involved. She was responsive to our request and was diligent in enforcing safety and health standards with all her staff and sub contractors. She demanded quality work and was proactive in spotting and correcting potential problems.”

James Floyd, Former Superintendent, Waldron Public Schools

 

“Turn Key Construction provided excellent service and quality work during the renovation. The project was completed in a timely manner and within the allotted budget. They were responsive to our needs as the construction progressed.”

Ryan Walker, Waldron District Support Services

 

View Project Gallery

Healthcare

Fort Smith

Fort Smith Dialysis Center

Location: Fort Smith, Arkansas

Year of Completion: 2012

Description:

  • Location: Fort Smith, Arkansas
  • Size: 20,000 Square Feet
  • Cost: $861, 287
  • Year of Completion: 2012
  • Owner Contact: Laura Palmer, Fort Smith, Arkansas: 479.755.7600

Testimonial:

“Sandy and Turn Key provided skilled employees and contractors who were very knowledgeable in their respective fields of expertise. They held regularly scheduled meetings during the construction phase between representatives from Turn Key and the Dialysis Center. These meetings established excellent working relationships between everyone involved.”

Laura Palmer, Executive Director

 

View Project Gallery

Dallas Street Dental Clinic

Location: Fort Smith, Arkansas

Year of Completion: 2010

Description: NEW CONSTRUCTION

  • This new dental facility was built on the site adjacent to Clark Family Chiropractic Clinic. The end result has been well received by the owner and its end-users alike. EIFS and stone veneer on the exterior provide a contemporary look while custom millwork and stained concrete flooring adorn the interior.
  • Size: 3,200 Square Feet
  • Location: Fort Smith, Arkansas
  • Year of Completion: 2010
  • Owner Contact: 479.452.6600

Testimonial:

“They efficiently completed my dental clinic and their professionalism and dedication to their clients is what impresses me most. I always felt Sandy Dixon was looking out for my interests and wanted to deliver the best possible building.”

Dr. Bill Ligon

 

View Project Gallery

Clark Family Chiropractic Clinic

Location: Fort Smith, Arkansas

Year of Completion: 2010

Description: NEW CONSTRUCTION; 2010

  • Description: This ground-up facility houses a family chiropractic clinic with reception area, offices, and patient rooms. Stylish and durable finishes were installed on the interior while classic and functional elements appear on the exterior.
  • Size: 3,123 Square Feet
  • Cost: $534,877
  • Location: Fort Smith, Arkansas
  • Owner Contact: 479.484.0805

Testimonial:

Brown, Hiller, Clark & Associates

“We have had the good fortune of working with Turn Key Construction since the company’s inception in 2007. We consider Turn Key to be an excellent well managed construction firm. I am certain you will find Turn Key to exhibit the highest level of professionalism and integrity in the prosecution of your project.”

Scott Clark

 

“Turn Key was excellent to work with, completing my project on time and on budget. Sandy was very active on the job site and when there were problems, she made sure they were solved in a timely manner. She has been amazing with follow up, not just for the first year, but still after almost 3 years.”

Dr. Betty Jo Clark

 

View Project Gallery

Mansfield

Mansfield Health Clinic

Location: Mansfield, Arkansas

Year of Completion: 2013

Description:

  • Location: Mansfield, Arkansas
  • Size: 8,460 sq. ft.
  • Cost: $757,643
  • Year of Completion: 2013
  • Description: This older kindergarten building was converted to a modern medical, dental and eye clinic.
  • Owner Contact: Mr. Robert Ross, Superintendent 479.928.4006

View Project Gallery

Ozark

Woolsey Family Dentistry

Location: Ozark, Arkansas

Year of Completion: 2011

Description:

  • Location: Ozark, Arkansas
  • Size: 2,600 Square Feet
  • Cost: $382,100
  • Year of Completion: 2011
  • Description: A new construction, 2,600 square foot dental facility consisting of wood-framed construction, architectural shingles, cultured stone and brick veneer with EFIS accent bands. Fully equipped with communications, dental and supporting equipment.
  • Owner Contact: Jason Woolsey, DDS PA, 1205 W. Commercial St., Ozark, Arkansas: 479.667.2083

Testimonial:

“Trust. Experience. Skill. High value. Honesty. These five characteristics were what we found in Turn Key. Sandy came in exactly on budget and left zero surprises for us during the construction phase. Michael Martin, the project manager, was always there to ensure that things were done correctly.”

Jason and Beth Woolsey

 

View Project Gallery

Renovations-Commercial

Fort Smith

Arkansas Oklahoma Gas

Location: Fort Smith, Arkansas

Year of Completion: 2013

Description: Remodel of existing corporate office facility including customer service, administrative office, conference room, kitchen area, upgrading of mechanical and data systems. All work was accomplished while bring a fully client occupied facility.

Size: 9,670 Square Feet

Architect: Architecture Plus

Testimonial:

“Turn Key was the general contractor on an extensive renovating project for AOG. We were pleased with the scheduling of the work and the end product, and would not hesitate to utilize Turn Key’s services in the future.”

Michael J. Callan, President

 

View Project Gallery

Northside High School Auditorium

Location: Fort Smith, Arkansas

Year of Completion: 2013

Description: High tech lighting, audio and video upgrades with new control booth, rigging, lifts, stage curtains, dressing rooms and mezzanine areas.

View Project Gallery

Mansfield Health Clinic

Location: Mansfield, Arkansas

Year of Completion: 2013

Description:

  • Location: Mansfield, Arkansas
  • Size: 8,460 sq. ft.
  • Cost: $757,643
  • Year of Completion: 2013
  • Description: This older kindergarten building was converted to a modern medical, dental and eye clinic.
  • Owner Contact: Mr. Robert Ross, Superintendent 479.928.4006

View Project Gallery

Fort Smith Dialysis Center

Location: Fort Smith, Arkansas

Year of Completion: 2012

Description:

  • Location: Fort Smith, Arkansas
  • Size: 20,000 Square Feet
  • Cost: $861, 287
  • Year of Completion: 2012
  • Owner Contact: Laura Palmer, Fort Smith, Arkansas: 479.755.7600

Testimonial:

“Sandy and Turn Key provided skilled employees and contractors who were very knowledgeable in their respective fields of expertise. They held regularly scheduled meetings during the construction phase between representatives from Turn Key and the Dialysis Center. These meetings established excellent working relationships between everyone involved.”

Laura Palmer, Executive Director

 

View Project Gallery

Hobson Preschool

Location: Fort Smith, Arkansas

Year of Completion: 2013

Description:

  • Location: Fort Smith, Arkansas
  • Size: 6,347 Square Feet
  • Cost: $300,200
  • Year of Completion: 2013
  • Description: The preschool was originally built in 1963 and has been modernized and renovated, including the playground with rubber cushion tiles.
  • Owner Contact: Krista Hinson, Director 479.783.4552

View Project Gallery

Kimmons Junior High School

Location: Fort Smith, Arkansas

Year of Completion: 2009

Description: Restroom Upgrades

 

 

View Project Gallery

Southside High School – Restroom Renovations

Location: Fort Smith, Arkansas

Year of Completion: 2008 / 2009

Description:

  • Location: Fort Smith, Arkansas
  • Cost: $163,908
  • Year of Completion: 2008/2009
  • Description: Restroom Renovations
  • Owner Contact: Fort Smith Public Schools

 

 

 

 

View Project Gallery

Southside High School

Location: Fort Smith, Arkansas

Year of Completion: 2010

Description:

  • Location: Fort Smith, Arkansas
  • Cost: $176,552
  • Year of Completion: 2010
  • Description: Renovations & Improvements to Existing Facility
  • Owner Contact: Fort Smith Public Schools

 

 

 

 

View Project Gallery

Northside High School

Location: Fort Smith, Arkansas

Year of Completion: 2011/2012

Description:

  • Location: Fort Smith, Arkansas
  • Cost: $137,583
  • Description: Window Replacement/Renovation
  • Owner Contact: Fort Smith Public Schools

 

 

 

 

View Project Gallery

Booneville VO-AG Building

Location: Booneville, Arkansas

Year of Completion: 2009

Description:

  • Location: Booneville, Arkansas
  • Cost: $332,995
  • Year of Completion: 2009
  • Description: New construction/ renovation to existing facilities. Exterior structure pre-engineered metal building and roof.
  • Owner Contact: John Parrish, Superintendent, Booneville Public Schools: 479.675.3504

Testimonial:

“Turn Key exceeded our expectations! They met all scheduled deadlines in spite of the project being started during inclement weather. My board informed me that Turn Key was the first construction company that they did not have to be involved with to resolve construction issues. They are a dependable company that you can trust.”

John K. Parish, Superintendent Booneville Public Schools

 

View Project Gallery

Pansey Kidd Middle School

Location: Poteau, Oklahoma

Year of Completion: 2011

Description:

  • Location: Poteau, Oklahoma
  • Size: 5,829 Square Feet
  • Cost: $630,000- competitive bid
  • Description: Library Addition/ Administration area renovations for the Poteau Public School system. With the enrollment constantly growing the school was in need of remodeling the entire administration area complete with new offices and more energy efficient lighting and HVAC system. Along with the ad¬ministration remodel, we added on to the existing library to accommodate more educational resources including literature and computers.
  • Owner Contact: Alice Smith, Former Superintendent, Poteau Public Schools: 918.647.9869

View Project Gallery

Chaffin Junior High School

Location: Fort Smith, Arkansas

Year of Completion: 2009

Description:

  • Location: Fort Smith, Arkansas
  • Size: 180,000 Square Feet
  • Cost: $2,095,000- competitive bid
  • Description: Building Upgrades. This project involved completely new HVAC systems, lighting, acoustical ceilings, flooring and painting throughout the school. The work also included full renovations to four large restrooms and the installation of a two-stop elevator. The work occurred in four phases with the vast majority of the work requiring completion in 75 days.
  • Owner Contact: R. Lynn Ellison, Retired Director of Buildings and Grounds, Fort Smith Public Schools: 479.806.3542

 

 

Testimonial:

“The largest and most complex project was the renovation of Chaffin Jr. High School. This project had a short time line, and even with unforeseen complications such as a massive asbestos abatement, it was completed ahead of schedule with a minimum of disruption to the school routine.”

R. Lynn Ellison

Director of Buildings and Grounds, Fort Smith Public Schools

 

“Turn Key constantly communicated with us during the project and included us in progress meetings.  Their staff was available at all times as concerns came up and t hey were willing to do all they could to resolve them.  They took personal pride and ownership in their work.”

Todd Marshell, Chaffin Junior High, Principal

View Project Gallery

Sutton Elementary School

Location: Fort Smith, Arkansas

Year of Completion: 2012

Description:

  • Location: Fort Smith, Arkansas
  • Size: 16,800 Square Feet
  • Cost: $2,430,000- competitive bid
  • Description: This project involved an eight-classroom, a cafeteria addition, with alterations to existing classroom areas. The structure is reinforced masonry with brick veneer. Interior finishes consist of custom patterns of carpets and rubber flooring.
  • Owner Contact: Alan Love, Director of Buildings and Grounds, Fort Smith Public Schools: 479.785.2501

 

 

 

 

View Project Gallery

Cedarville Elementary School

Location: Cedarville, Arkansas

Year of Completion: 2011

Description:

  • Location: Cedarville, Arkansas
  • Size: 54,876 Square Feet
  • Cost: $1,394,598 – Construction Management
  • Description: Elementary School Upgrades. This project involved many improvements throughout the school including HVAC renovations, new acoustical ceiling tile, lighting/electrical upgrades, and new roofing.
  • Owner Contact: Dan Foreman, Superintendent, Cedarville Public Schools: 479.474.7220

View Project Gallery

Cedarville Elementary School – Tornado Shelter

Location: Cedarville, Arkansas

Year of Completion: 2012

Description:

  • Location: Cedarville, Arkansas
  • Size: 6,250 Square Feet
  • Cost: $1.3 Million- Construction Management
  • Description: Tornado Shelter Facility. This safe room doubles as the elementary school cafetorium. The building structure is pre-cast concrete walls and ceiling, with brick veneer on the outside to enhance the aesthetic value. The interiors are designed with a commercial kitchen and restrooms to complete the multi-purpose/cafetorium facility.
  • Owner Contact: Dan Foreman, Superintendent, Cedarville Public Schools: 479.474.7220

 

 

 

 

View Project Gallery

Cedarville High School

Location: Cedarville, Arkansas

Year of Completion: 2011

Description:

  • Location: Cedarville, Arkansas
  • Size: 5,780 Square Feet
  • Cost: $2,947,000 (Middle and High School Total)- Construction Management
  • Description: Classroom Addition, New Gymnasium, Cafeteria Expansion. The High School addition includes new classrooms and science labs as well as a cafeteria expansion. Custom millwork was installed in each science lab and the cafeteria is home to a feature ‘window-wall’ that opens to the adjacent outdoor patio. The exterior structure is CMU with brick veneer.
  • Owner Contact: Dan Foreman, Superintendent, Cedarville Public Schools: 479.474.7220

 

 

View Project Gallery

City of Alma Fire Station #1

Location: Alma, Arkansas

Year of Completion: 2009

Description: City of Alma – Office Additions at Fire Station #1

  • Location: Alma, Arkansas
  • Description: In 2009, Turn Key Construction Management completed renovations to the existing facility as well as an office addition.
  • Architect: Architecture Plus, Inc.
  • Size: 1,677 Square Feet

 

View Project Gallery

Springdale Police CID

Location: Springdale, Arkansas

Year of Completion: 2013

Description:  

  • Size: 9,800 Square Feet
  • Description: Constructed on the Razorback Trailway, is the rehabilitated existing two story structure with a basement creating a police Criminal Investigation Division office facility with a reception area, conference, interrogation, observation rooms and multiple offices. The project also incorporates a complete workout facility with shower and dressing areas for the Springdale police personnel.
  • Owner Contact: Wyman Morgan, City of Springdale: 479.750.8114

View Project Gallery

Student Support Facilities

Location: Fort Smith, Arkansas

Year of Completion: 2007

Description: ADDITION / REMODEL

  • Location: Fort Smith, Arkansas
  • Description: An existing outdated office space required complete interior demolition and created a new student services office with a mezzanine file storage area. Construction added a new covered front entry and back entry, and repainted the entire existing metal building that housed the food storage warehouse and office.
  • Architect: Architecture Plus, Inc.
  • Size: 3,200 Square Feet
  • Owner Contact: R. Lynn Ellison, Retired Director of Buildings and Grounds: 479.806.3542

 

 

View Project Gallery

Alternative Learning Center

Location: Waldron, Arkansas

Year of Completion: 2009

Description:

  • Location: Waldron, Arkansas
  • Description: Renovations and additions to the existing Alternate Learning Center created additional classrooms, dining area and kitchen. A majority of the existing concrete floors were polished and stained to create maintenance free floors.
  • Architect: Douglas Arnold & Associates
  • Size: 11,433 Square Feet
  • Owner Contact: Dr. James Floyd, Superintendent: 501.626.9187

Testimonial:

“I found Ms. Dixon to be very professional and easy to work with in her dealings with all parties involved. She was responsive to our request and was diligent in enforcing safety and health standards with all her staff and sub contractors. She demanded quality work and was proactive in spotting and correcting potential problems.”

James Floyd, Former Superintendent, Waldron Public Schools

 

“Turn Key Construction provided excellent service and quality work during the renovation. The project was completed in a timely manner and within the allotted budget. They were responsive to our needs as the construction progressed.”

Ryan Walker, Waldron District Support Services

 

View Project Gallery

4200 Jenny Lind

Location: Fort Smith, Arkansas

Year of Completion: 2009

Description: 4200 JENNY LIND

  • Location: Fort Smith, Arkansas
  • Description: Construction consisted of remodeling 14,000 Square Feet of an existing clinic and created 5 separate lease spaces for medical and accounting professionals. Construction also included a new covered canopy entrance at the north side of the building.
  • Cost: $1.1 Million
  • Architect: Guest Reddick Architects Square Footage: 14,072
  • Owner Contact: Certified Public Accountant: 479.649.0888

Testimonial:

“Our project with Turn Key resulted in a seamless effort to schedule logical sequencing for the project thus causing the least amount of disturbance to the existing tenant. Not an easy task considering the need to interrupt utilities from time to time, but Turn Key scheduled these items to be done during none business hours without additional expense to the owner.”

David. W. Conyers, Vice President, Guest, Reddick Architects

 

View Project Gallery

Northwest Arkansas

nothing found.

Residential

Fort Smith Home

Location: Fort Smith, Arkansas

Year of Completion: 2001

Description:

  • Location: Fort Smith, Arkansas

View Project Gallery

Mountain Harbor

Location: Hot Springs, Arkansas

Year of Completion: 2008

Description: Location: Hot Springs, Arkansas

View Project Gallery

Next Step Dayroom

Location: Fort Smith, Arkansas

Year of Completion: 2012

Description: Description: A 2-story transitional home for veterans consisting of 16 private bedrooms, 3 community bathrooms and commercial kitchen with large central commons area. Constructed in residential fashion with wood framed structure on concrete slab. Maintenance free exterior finishes consisting of vinyl siding and windows, brick wainscot and architectural singles.

View Project Gallery